Construction of two futuristic stops on Baralt Avenue in Caracas progresses by 70%

Specialized crews also work, in parallel, on wall cladding with hammered concrete
Minister of the People's Power of Public Works

Published at: 08/09/2026 07:43 PM

The Ministry of the People's Power of Public Works (MPPOP), reported this Tuesday, September 08, that the construction of two futuristic public transport stops on Baralt Avenue, near the Quinta Crespo sector, in Caracas, registered an increase of 70%.

In a press release published on its website, the ministry explained that the tasks include the emptying of concrete slabs on the floor, the assembly of structures and the waterproofing of roof covers.

In addition, the installation of the perimeter enclosure and the installation of the drainage system are carried out.

The specialized crews also work, in parallel, on the coating of walls with hammered concrete, as well as on the adaptation of a modern electrical system equipped with luminaires and electrical outlets.

Also, in the installation of wooden benches for users and the assembly of metal structures equipped with acrylic sheets for greater protection against weather conditions.

With these works, the Bolivarian Government plans to optimize the mobility of the population and optimize waiting for public transport in one of the busiest commercial spaces in the capital city.

Mazo News Team

Share this news: