Caracas Metro activates Metrobús contingency route between Antímano and Las Adjuntas (+maintenance)

Railroad Stabilization and Sanitation Plan
Photo: Social networks

Published at: 15/09/2026 11:08 AM

Metro de Caracas activates the Metrobús contingency route to facilitate the transportation of users during high-impact work on the underground system service.

The operational measure seeks to directly address the flow of daily passengers on line 2, specifically through a continuous circuit that connects the Antímano and Las Adjuntas stations.

The special ground transportation plan operates during the commercial service time block, from 05:45 to 09:30 in the morning. During this period, the assigned fleet provides permanent support to people who need to travel between both terminal stops.

This authorization responds to the continuation of the Railroad Stabilization and Sanitation Plan, so the institution urges the population to take the corresponding forecasts, follow the instructions of the operational staff and check for news on official channels.



Mazo News Team

Share this news: