Ministry of Transport announced the closure of the Hoyo de la Puerta Distributor from August 22 to 25

During that period, traffic will be diverted through the lower part of the structure, allowing drivers to rejoin the Tazón Toll
Internet

Published at: 21/08/2025 02:11 PM

The Ministry of People's Power for Transportation reported that, due to work on the expansion joints of the Hoyo de la Puerta Distributor in the direction of Maracay, located on Troncal 1 in Caracas, the road will be completely closed from August 22 to 25, from 9:00 p.m. to 5:00 a.m.

During that period, traffic will be diverted through the lower part of the structure, allowing drivers to rejoin the Tazón Toll.

“We invite the community to take the necessary preventive measures in the face of the tasks carried out by our working class,” said the Ministry.


Mazo News Team

Share this news: