Bolivarian Government installed new equipment to improve pumping in Tuy II
Miranda Governorate
Published at: 23/02/2024 11:15 AM
A 5,300 kilowatt engine was installed this Thursday at pumping station 21, in San Antonio de Yare, Simón Bolívar municipality, to strengthen drinking water service in the Tuy II system.
The information was issued through a press release from the Government of Miranda, in which it was detailed that the works were carried out by the Capital Hydrology Company (HIDROCAPITAL).
He also pointed out that the maintenance, as well as the optimization of infrastructures and water systems in the entity, are part of the actions framed in the General Water Staff for the state of Miranda.
Mazo News Team