Bolivarian Government intensifies road rehabilitation in Guárico
Guárico Governorate
Published at: 16/03/2026 08:48 PM
The Bolivarian Government, in a sustained effort to transform the infrastructure of the Guárico state, activated the extra-urban road maintenance plan in order to intensify road rehabilitation in this entity.
Under the premise of working “Day, Night and Early Morning”, the governor of Guárico, Donald Donaire deployed fronts of work at various strategic points to ensure that producers, carriers and drivers have safe road arteries.
In addition, infrastructure crews are maintained in Troncal TO02, specifically in the section that connects Las Maravillas to El Rastro.
During the work, 28 tons of hot asphalt mixture were poured, an action aimed at eliminating irregularities in the road and optimizing vehicle flow in this area of vital agricultural importance for the entity.
Simultaneously, the Extraurban Road Maintenance Plan is progressing on Troncal TO13, in the Arbolito-Memo section. At this point, the installation of hot asphalt mixture does not stop and progresses steadily towards the comprehensive rehabilitation of the bearing binder.
In addition, road safety depends not only on asphalt, but also on an efficient drainage network. In this regard, the regional government announced the successful completion of the construction of sewer headers in the same TO13, specifically in the vicinity of the El Sombrero Toll and the Bamari Air Base.
This massive deployment is the result of an articulated and cohesive work between the Government of Guárico, the Ministry of Popular Power for Transportation (MPT) and Construvialgua. This strategic alliance allows for the maximization of resources and ensures that machinery and technical personnel are present where they are most needed.
On the other hand, the equipment is also located on the El Sombrero bridge. In this TO13 infrastructure, patching and leveling work is carried out on the bearing folder.
Governor Donaire's administration addresses the urban environment under the vision of the “2 T Transformation of Public Services and Infrastructure”. In addition, on Las Industrias Avenue in Valle de la Pascua, progress is being made in the construction of brooches for the central separator.
This work not only improves the aesthetics of the city, but it is part of a comprehensive rehabilitation system that includes the modernization of public lighting.
The regional president reaffirmed his commitment to the People and assured that road recovery is a non-negotiable priority for his administration. With every ton of asphalt that is placed and each sewer repaired, the state of Guárico consolidates itself as an axis of efficient connectivity that promotes economic development and the well-being of all Guárico families.