Bolivarian Government rehabilitates roads in Unión de Lara parish
Internet
Published at: 24/03/2026 03:15 PM
The road rehabilitation of Carrera 1 in the El Carmen neighborhood and Carrera 5 in Los Twilight, in the Unión parish of the Iribarren municipality, Lara state. it ended in an efficient and satisfactory manner.
The work involved the installation of 739 tons of hot asphalt, which guarantees safe mobility for the inhabitants of the state of Lara.
The work carried out by the Lara Road Institute (INVILARA) succeeded in removing more than 3,911 square meters of deteriorated asphalt binder, through the scarification process. In addition, the material derived from these tasks was loaded and transported.
In addition, 29 cubic meters of granular pellet-like material were placed to recover the base layer. In the same way, priming and adhesion irrigation work was carried out with RC2 asphalt emulsion on the intervened areas.
In this way, the Government of Lara maintains its commitment to recovering urban, agricultural and rural roads, after working effectively to guarantee the well-being and mobility of Larense communities, strengthening the state's road infrastructure.
Mazo News Team