Ministry of Transport advances a 37% installation of the El Muerto bridge in Bruzual in Apure

The structure will allow reconnection with the El Mantecal sector in Barinas
Instagram Ministry of Transport

Published at: 21/07/2025 05:50 PM

The Ministry of Popular Power for Transportation (MPPT) has advanced the process of installing the El Muerto bridge in Bruzual, Apure state, by 37%, which is a project that will allow reconnection with the El Mantecal sector in Barinas.

In its Instagram account, the MPPT, indicated that the bridge will allow the reactivation of the traffic of people and cargo between the two entities, after heavy rainfall in the plain region.

“We are still committed to the mobility of the people!” , assures.

On the other hand, in another message, the MPPT also reported that the rehabilitation work on the railway section that goes from the state of Carabobo to Portuguesa and Lara is well under way.

“Of the 6 complex work fronts for the restoration of the Puerto Cabello - Acarigua - Barquisimeto railway, 4 are at 100% while the rest are at 75% and 95% completed,” he says.

In this regard, he affirms that very soon “the cargo train will be circulating that will strengthen the national economy, through the exports of Venezuelan products. From the central states, straight to the dock for export. We're still winning!”

Mazo News Team

Share this news: