Bolivarian Government reopens road crossing after completing correction work on the Los Ruices bridge

Work has been completed on the access ramp from the Gran Cacique Guaicaipura Highway to El Cafetal - Caurimare
Photo: Capture

Published at: 07/05/2025 09:42 AM

The Ministry of People's Power for Transport reported that work was successfully completed to correct the settlement of the southern abutment of the Los Ruices bridge, west runway (Los Ruices - Caurimare), Sucre municipality, Miranda state

Through his social networks, he explained that thanks to the dedication of the workforce, the works were successfully completed, so the road crossing was opened on the access ramp from the Gran Cacique Guaicaipura Highway to El Cafetal - Caurimare. “Let's strengthen the mobility of citizens!” , he said.

The personnel of the transport portfolio shaped the base, leveled the ground with a crushed stone base, and reinforced with steel to ensure the safety of drivers who travel through that town.



Mazo News Team

Share this news: