Construction of the bridge connecting Higuerote and El Guapo is 90% complete

The works will help improve the mobility of the Mirandina population
Photo: Screenshot

Published at: 12/07/2024 10:59 AM

The construction of the El Tigre Bridge, which connects from Higuerote to El Guapo, Miranda state, is 90 percent complete.

This was reported by the Ministry of Transport through its X account, where it detailed that among the works carried out is the emptying of concrete in the side walls for the formation of access ramps to the structure that will benefit the mobility of the Mirandina population.

Mazo News Team

Share this news: