Ministry of Energy oversees SEN facilities in Barinas

Hand in hand with the authorities
Courtesy Internet

Published at: 03/06/2026 05:51 PM

The People's Power Minister for Electric Energy, Rolando Alcalá, led an exhaustive day of technical inspections at hydroelectric power plants, generation plants and electrical substations in the state of Barinas, rigorously complying with the instructions issued by the president in charge of the Bolivarian Republic of Venezuela, Delcy Rodríguez.

The holder of the Electric Energy portfolio was accompanied by the president of the National Electric Corporation (CORPOELEC), José Luis Betancourt, with whom he coordinated the technical and operational evaluations of the Juan Antonio Rodríguez Domínguez and Masparro Hydroelectric Power Plants; as well as the Barinas IV and Varyná 115 kV substations; and the Thermobarrancas Plant, according to a press release from the ministerial portfolio.

The deployment was characterized by an environment of high morale and commitment, where the authorities inspected the restoration of the sloping walls of the discharge channels (slope), perimeter fence, maintenance of the bridge, beautification of the infrastructure, construction of a dining room and warehouse. They also supervised improvements in the access road and maintenance of the power transformers, to ensure the operability and safety of the facilities.


Mazo News Team

Share this news: