Ministry of Transport works on road recovery in Guárico
Photo: Min. Transportation
Published at: 16/07/2024 08:50 AM
The Ministry of Transportation is carrying out asphalt recovery work on trunk 2, specifically the María Nieves Bridge section to the Aldao Bridge, in the state of Guárico.
This was detailed in the Transportation portfolio in its X account, where it detailed that the above-mentioned works contemplate the scarification of faults in the pavement more than 1000 meters of track, as well as the installation of 379 tons of asphalt.
Mazo News Team