Zulia: Bolivarian Government fully rehabilitated the El Switche Wastewater Treatment Plant
Photo: Social Network X
Published at: 18/07/2024 10:53 AM
The Minister of the People's Power for Water Care, Rodolfo Marco Torres, announced the total rehabilitation of the El Switche Wastewater Treatment Plant, in Cabimas, Zulia state.
“We have fully rehabilitated the El Switche Wastewater Treatment Plant, together with the organized Popular Power. Always on the side of the People, as the Giant Hugo Chávez Frías taught us. Let's go talk!” , he said through a post on his account on the social network X.
Marco Torres, together with the president of the Maracaibo Lake Hydrology Company (HIDROLAGO), Félix Torres and the organized Popular Power, supervised the arrival of new 100 and 125 HP motors and pumps to complete the rehabilitation of three pumping stations and the El Switche Treatment Plant, which will strengthen the sanitation system in the Cabimas municipality of the state of Zulia.
He also argued that the People are wise, “we continue to bring early solutions to communities in the state of Zulia through the reports of the 1X10 On Good Government, an instruction from our president Nicolás Maduro,” he added.
Mazo News Team