Bolivarian Government began construction and assembly of structures at a pumping station in Aragua
Regional Media
Published at: 19/09/2024 10:34 AM
The Bolivarian Government began construction and assembly of structures for the installation of two submersible pumps to improve the efficiency of the pumping station in the José Casanova Godoy parish, in the state of Aragua.
The work is 80% complete and consists of two cabins where the pumps are located and then the drive pipe is connected.
These pumping equipment have multiple suction and discharge characteristics of four thousand 200 liters per hour, as they have an automated operating system that controls the start and power of submersible pumps, according to a note from regional media.
The new units stand out for their high performance, they have an operating range of nine thousand continuous hours.
Mazo News Team