CORPOELEC makes adjustments to the distribution network of Eje Tuy in Miranda

The maneuvers were concentrated in the Manguito I, II, III, IV, V and VI sectors in the Paz Castillo municipality
Photo: MPPEE press

Published at: 26/01/2026 01:00 PM


The National Electric Corporation (CORPOELEC) made technical adjustments to the distribution network for the benefit of more than 15,000 users of the Tuy Axis in Miranda state.

The Ministry of People's Power for Electric Energy (MPPEE) reported that CORPOELEC personnel replaced strategic components to optimize energy flow and strengthen the stability of the National Electric System (SEN).

In addition, he specified that the maneuvers were concentrated in the Manguito I, II, III, IV, V and VI sectors, and in surrounding areas of the Paz Castillo municipality.

In addition, crews reactivated 30 street lighting points by installing luminaires with LED technology in the communities of Tomuso and El Alto, between the municipalities of Independencia and Paz Castillo.


Mazo News Team

Share this news: