CORPOELEC will carry out maintenance at the San Jaime substation in Monagas state
Photo: Internet
Published at: 23/01/2026 01:40 PM
The National Electric Corporation (Corpoelec) will carry out maintenance at the San Jaime substation in Monagas state, this Saturday, January 24.
The work will be carried out to strengthen the operability of the state's electricity system, according to a press release from the Ministry of People's Power for Electric Energy (MPPEE).
This Friday, technical maneuvers were carried out from 6:00 to 9:00 in the morning to optimize energy flow and ensure supply stability in the Alto de Los Godos parish.
These tasks were carried out for the benefit of the Chávez I and II urbanization sectors; Guanaguaney; La Gran Victoria; Las Delicias I, II and IV; Samán II and IV; Los Prados I, II, III and IV; Apamates I, II, III and IV, and El Ejercito and Los Pájaro avenues.
In addition, the works will benefit users of the Los Pájaro Residences; Callejón Universidad; San Rafael; Guaritos I to III; Canal 90; El Abanico; José María Vargas; Paramaconi Complex; Los Godos; Las Comunales and El Campito.
On the other hand, the operation will serve health infrastructures, such as the Comprehensive Diagnostic Center (CDI) of Los Godos and the headquarters of the Dr. José María Vargas Hospital.
Mazo News Team