Five thousand families in Monagas receive improvements in electrical service with installation of 26 transformers
ELEC BODY
Published at: 29/01/2026 12:19 PM
Five thousand families in the municipalities of Bolívar, Punceres, Libertador and Maturín now have a reinforced distribution system thanks to the installation of 26 transformers by the National Electric Corporation (CORPOELEC)
The intervention responded to complaints made by community organizations through Line 58 of the VENAPP application of the 1×10 System of Good Governance.
The work was carried out in 21 sectors of the parishes of Caripito, Quiriquire, Temblador, Alto de Los Godos, Santa Cruz, Las Cocuizas, San Simón and Boquerón. Among the affected areas are La Antena in Campo La Floresta, Calle El Tigre, La Curva, La Reforma, Avenida Andrés Eloy Blanco, La Lucha de Alto Paramaconi, Avenida Cruz Peraza and Camino 5 de Los Godos.
Interventions were also carried out in Barrio Bolívar, Las Piedras de Viboral, La Llovizna, Alto Paramaconi II, La Villa, El Maco, Línea Nueva, Calle 1 de Prados del Sur and Francisco de Miranda, where the installation of the equipment allows balancing the load on the network.
These actions are part of the work of the CORPOELEC technical force to reinforce energy distribution and carry out the implementation of policies aimed at improving public services.
Mazo News Team