Bolivarian Government replaces more than 80 meters of rails in the Carrizalito tunnel of the Los Teques Metro
Internet
Published at: 01/11/2024 11:37 AM
In order to optimize the railroad conditions of the Compañía Anónima Metro Los Teques, a multidisciplinary team replaced 87.95 linear meters of bearing rails in the Carrizalito tunnel as part of the 2024 Maintenance Plan.
The information was published on the Instagram social network account of the Ministry of People's Power for Transport, where he reported that the replacement of metal bars, aluminothermic welding and the carrying out of the relevant tests to verify their proper functioning.
These tasks were carried out by 36 qualified professionals from the railway company, to ensure the safety of users and thus guarantee a comfortable, efficient and safe trip for all users of the Altos Mirandinos.
Mazo News Team