CORPOELEC carried out maintenance on electrical circuits on the Barlovento axis
Internet
Published at: 19/08/2025 02:20 PM
The National Electric Corporation (CORPOELEC) reported on the execution of maintenance work on the San José, Sarao, Raizal and Nueva Alejandrina electrical circuits, located in the municipalities of Andrés Bello, Pedro Gual and Páez in the state of Miranda.
The crews replaced conductors, insulators and lines, as well as vegetation control in low and medium voltage corridors. These actions benefit communities in the parishes of San José de Rio Chico, Cúpira, Machurucuto and Tacarigua de la Laguna.
The operation is part of the actions of the Ministry of People's Power for Electric Energy aimed at strengthening the National Electricity System.
Mazo News Team