Marco Torres: Work on the Zuata de Aragua reservoir progresses by 80%

Zuata Reservoir in the Argentine state
Screenshot

Published at: 17/06/2024 09:21 AM



The Minister of Popular Power for Water Care, Rodolfo Marco Torres, reported that the construction of an open channel in the Zuata reservoir in the state of Aragua is 80% complete.

“Extraordinary work with an impeccable engineering design, to optimize the water irrigation system and ensure the control and optimal regulation of the water resource, serving the population and the agricultural sector in the area,” he said through the social network X.

In this regard, he explained that in the works, 200 linear meters of reinforced concrete have been placed, 12 tanks of the emptied drainage system of more than 1 thousand cubic meters of granular and concrete material.

“In any challenge, and under any circumstance, we always have a strong president loyal to his people, Nicolás Maduro,” he emphasized.

Mazo News Team


Share this news: