This Sunday they will carry out maintenance on the Valles del Tuy railway system

The works will be carried out from 4:00am to 12:00pm
Internet

Published at: 12/10/2024 07:12 PM

To ensure the operability and safety of the Caracas-Cúa line, Miranda state, during the rainy season, preventive “pick and prune” maintenance activities will resume on the catenary system of the Ezequiel Zamora I Railroad during the rainy season on Sunday.

According to information from the State Railroad Institute (IFE), the work will be carried out from 4:00am to 12:00pm, and will consist of pruning vegetation close to the overhead electrical cables, with the objective of avoiding possible damages and ensuring a continuous and efficient service.

These tasks have been essential to keep the railway route that connects Caracas with the Valles del Tuy in optimal condition, the Institute said.

Mazo News Team

Share this news: