CORPOELEC maintained two electrical substations in Anzoátegui to improve service

CORPOELEC maintained the Barbacoa I and Tronconal V substations
Photo: CORPOELEC

Published at: 02/10/2025 11:39 AM

The National Electric Corporation (CORPOELEC) deployed engineering, transmission and distribution technical personnel to apply preventive maintenance schemes to the Barbacoa I and Tronconal V substations, located in the Simón Bolívar municipality of the state of Anzoátegui.

The day, according to a press release from CORPOELEC, seeks to improve the operating conditions of the equipment and elements associated with electricity transformation units to ensure their full operation and at the same time provide greater stability to the National Electrical System (SEN).

These actions translate into benefits for the Eastern population, since they contribute to strengthening energy delivery in the northern area of Anzoátegui and improving the operating conditions of these units.

Mazo News Team

Share this news: